    As we undertake all aspects of carpentry, building and property maintenance, we have all the expertise needed to build a home, a garage, a summer house or whatever it is that you would like. Recently we constructed a triple garage with an apartment on the first floor for a client in the east of the island. Some examples of the larger projects we have undertaken are given below:

    New Construction - Ground floor triple garage, first floor apartment

    The client wanted us to construct and finish a triple garage with a one-bedroom apartment above it. Please note this project is still ongoing and pictures of the completed project will be ready soon.

    View of the site at the beginning with the wall that the client wanted to retain in the building.

    Digging out a trench to put the steel columns for a new retaining wall.

    Construction of the retaining wall.

    Materials arriving on site.

    Setting out for concrete block columns.

    Building one of the columns.

    Steelwork for the retaining wall.

    Further progress on site.

    Columns, retaining wall and new ring beam.

    Boards of retaining wall braced and supported to allow concrete to be pumped in.

    Concrete has been pumped in and is setting.

    Columns, retaining wall and some scaffolding.

    Looking down at the progress of the ground floor.

    Moving onto the second level.

    Installation of timber frame to second level.

    Another view of the timber frame.

    View of the ground floor ceiling and first floor timber.

    Installation of the roof to the first floor.

    The roof was a bespoke design to fit the client’s wish to have a vaulted ceiling in the kitchen/lounge area but a lower flat ceiling in the bedroom and bathroom areas.

    The trussed part of the roof.

    Gable end of the roof with view of the beam - this beam was left exposed in the kitchen/lounge area, as per the client’s wishes, and where the beam was cut off at the gable end of the building, the visible part of the beam was clad to make an exterior feature.

    The first floor before concrete walls are constructed.

    Blockwork coming up the gable end of the house.

    Construction continues.

    Another view of the first floor.

    View of the roof from inside the first floor.

    View of a first floor room, before kingspan insulation and plasterboard is installed and skimming is completed.

    The project before plastering and painting is completed.

    Fitting of feature window

    NEW PROJECT REFURBISHMENT OF FOUR NUMBER GARAGES.

    Description of works replace all garage doors with new, Take of existing roof and replace and re cover, replace gutters and facias and decorate.

    After exsisting roof was stripped off.

    Hard at work no matter what the weather.

    start to replace roof.

    New ply laid onto new roof joists.

    NEW PROJECT

    To lay oak flooring for client in house renovation to seven rooms.

    Some pictures of finished product.

    NEW PROJECT TO CONSTRUCT HIP CUT ROOF ON HOUSE EXTENSION AJOINING INTO EXISTING ROOF WITH VALLEYS.